The bridge, built for MRWA, is a 100m long 2 span steel/concrete composite structure that replaces an old timber bridge on Coolup East Road over the Murray River, 10km south of Pinjarra.
Fortec was engaged by BMD Constructions to perform the works, including the supply of launching bearings.
Click here to read more about this project.