Bridge Works

1 2 3
  • Great Northern Highway Approach Slabs

    Main Roads Western Australia

    Fortec was engaged to carry out approach slab replacements to five bridges in the Pilbara Region as the existing bridge approach slabs had deteriorated along the heavy haulage route.
  • Construction of Bridge 3528A Murray River

    BMD Constructions

    The existing bridge structure, the deck and substructure of Bridge 3528A has deteriorated significantly.
  • Maintenance of Footbridge 9042 Powis Street Crossing

    Main Roads Western Australia

    Bridge No. 9042 is a footbridge that provides pedestrian access over Powis Street and is owned by the City of Stirling.
  • Garratt Road Bridges Pile Potting & Maintanance

    Main Roads Western Australia

    Contract 156/15 is for the refurbishment to timber bridges 950 and 952 crossing the Swan River at Garratt Road in the Perth metropolitan area.
1 2 3