Bridge Works

1 2 3
  • Maintenance of Bridges Mid-West Gascoyne Region

    Main Roads Western Australia

    The concrete piles on bridges 3025A & 3026A were showing signs of cracking and corrosion to the steel reinforcement and concrete damage in the flood zone.
  • Replacement of Bridge 5046 Beams Karratha

    Leighton’s Pilbara ISA (Main Roads)

    Fortec was engaged by Leighton Contractors under Main Roads WA Pilbara Integrated Services Arrangements to replace bridge beams on Bridge No. 5046 on Searipple Road in Karratha.
1 2 3