Geotechnical

  • Fairbairn Dam Spillway Anchoring

    Sunwater

    An inspection of Fairbairn Dam in 2015 recorded an increasing level of seepage through the joints in the spillway chute concrete slabs.
  • Marmion Angling Club Soil Nails

    Ertech

    Fortec was engaged by Ertech Pty Ltd to perform the soil nail installation for the City of Joondalup at the Marmion Angling and Aquatic Club.
  • East Street Erosion Control

    STATS

    STATS engaged Fortec to perform the application of fibrecrete to a collapsed wall section spanning approximately 11 metres in length by 10 metres in height and sprayed to a nominal thickness of 100mm.
  • Quarry Amphitheatre Remediation

    Town of Cambridge

    The amphitheatre is located in an old limestone quarry located in the Town of Cambridge. The venue is used extensively between October and May for a wide range of events.