Project experience

Geotechnical

Fairbairn Dam Spillway Improvement

Fortec was engaged by Sunwater to undertake drilling, grouting and installing of anchors as part of the Fairbairn Dam Spillway Improvement Project.
Read more
Post Tensioning

Cunderdin Water Tanks Construction

Fortec was engaged by BGC Construction to design the 2NO 37.5ML pre-cast post tensioned tanks and install post tensioning to the two tanks.
Read more
Post Tensioning

Coopers Shoot Water Tank Construction

Fortec was engaged to supply and install post tensioning services to a new reservoir at Coopers Shoot and Bangalow, located in Byron Bay.
Read more
Bridges

Construction of Bridge 3528A Coolup

Fortec was engaged by BMD Constructions to perform the launching works including supply of launching bearings for the replacement of the bridge.
Read more
Bridges

Bridge 977 Leach Highway

Fortec was engaged by Main Roads WA to safely remove the existing bridge bearings at the abutments and piers and replace with new bearings.
Read more
Bridges

Bibbulmun Track

The Department of Parks and Wildlife engaged Fortec to construct the pedestrian bridge footings over the Murray River on the Bibbulmun Track.
Read more
Post Tensioning

Beenyup WTP Tanks Post Tensioning

Fortec was engaged by D&Z Constructions to design the concrete base and walls and supply and install post tensioning services to 2 new 13.7ML tanks at the Beenyup WTP.
Read more

Featured Projects

Speak to us about your project

Fortec delivers projects as a main contractor and sub-contractor to clients across a broad range of sectors throughout Australia.

Fortec provides a diverse range of specialist construction, engineering and geotechnical services to private and public sector clients, including water and road authorities and private developers of infrastructure, commercial, industrial and residential developments.

Contact Us